Draft and export a report
Use this workflow when you are creating or finalizing a customer-facing report.Prerequisites
- You can open Reports
- At least one visible engagement exists
- At least one usable report template exists
Report access: Viewing reports, generating new drafts, editing a workspace, reviewing content, publishing to the
portal, and exporting a PDF or DOCX can all be governed by different permissions.
Steps
1
Open the reports page
Go to Reports to review the current report list. Use filters for status, severity, mode,
review status, and publication state when you are scanning across engagements.
2
Create a one-off draft
If the create form is available, choose an engagement and a template, then select Create
Report. This opens the structured report workspace. New engagements also create an initial
workspace automatically at intake.
3
Work in the report workspace
Update the report title, description, status, section content, and selected findings. Use
reusable snippets where available to speed up repeatable sections.
4
Save the draft intentionally
Save from the workspace before you export or publish. Saving writes the fields you changed. A
teammate’s saved edit shows up within a few seconds, and text you have not saved stays in the
field. You can save while that update is still arriving. Reset changes shows the latest
saved value. The publish panel follows that saved draft. You do not need to refresh the page.
Read-only access on the engagement can see
those saved edits and cannot save. Workspace save is not the same as PDF export, DOCX
generation, or portal publication.
5
Coordinate review when needed
Use the Review panel to add threads, reply, resolve discussion, and track reviewer approvals
before delivery. Approval covers the saved content shown to the reviewer; save or discard unsaved
edits and refresh if prompted. A later saved content change may require approval again.
6
Export the PDF or generate a DOCX when the draft is ready
Use Download PDF only if your role can export reports. On a structured report workspace, use
Generate DOCX with a Word template. The template is filled from the saved draft and is not
stored. If the report is legacy, Strikepoint may show a read-only view with PDF export and
without DOCX generation.
7
Publish to the portal when approved
When review is complete and readiness checks pass, publish approved report content to the
customer portal. See Review and publish to the
portal.
If you manage report libraries
Manager only: If you are responsible for reusable report content, maintain Templates and Snippets before
creating new drafts at scale.